Delivery time includes production, testing, packing, transportation, and any clearance or local delivery steps. There is no single lead time for every order.
Product and quantity: Standard configurations and custom designs may have different production schedules.
Customization: Special shapes or structures can require additional preparation.
Transport: Shipping method, route, and destination affect arrival time.
Confirm both the estimated dispatch date and estimated arrival date before ordering. For event projects, allow time for installation and testing after delivery. An estimated transit time alone is not the total order lead time.
+86 190 6898 0465
3F, Building 2, Wanyan Industrial Zone, Fuhai, Baoan, Shenzhen, China 518103
FLAT 02,BLK B,2/F,HOOVER INDUSTRIAL BUILDING,26-38 KWAI CHEONG ROAD,Kwai Chung,HK